Skip to content
PYD ENTERPRISES

Legacy Modernization Index · 2026 edition

The numbers behind legacy modernization, with sources.

A short, sourced index of what is publicly known about legacy code footprint, technical debt, public sector spend and migration consequences, next to PYD ENTERPRISES' own discovery model, clearly labelled.

lines of COBOL estimated in daily production use worldwide
800B+
lines of COBOL estimated in daily production use worldwide
Vanson Bourne survey for Micro Focus, February 2022 (estimate range 775 to 850 billion)
accumulated software technical debt in the United States
$1.52T
accumulated software technical debt in the United States
CISQ, The Cost of Poor Software Quality in the US: A 2022 Report
of the US federal FY2015 IT budget went to operating and maintaining existing systems
~75%
of the US federal FY2015 IT budget went to operating and maintaining existing systems
US GAO, GAO-16-468, Federal Agencies Need to Address Aging Legacy Systems (May 2016)
combined FCA and PRA fine on TSB over its 2018 core platform migration
£48.65M
combined FCA and PRA fine on TSB over its 2018 core platform migration
UK FCA and PRA final notices, 20 December 2022

Explorer

Four themes. Every figure linked to its source.

Switch themes to see each figure in context. Move the estate slider to apply PYD ENTERPRISES' planning model to your own line count.

2M

COBOL IN DAILY PRODUCTION USE · BILLIONS OF LINES

700750800850900800B+775850
43%

of surveyed COBOL code runs on IBM z/OS. The remaining 57% runs on other platforms, which is why discovery tooling has to handle Micro Focus dialects as well as Enterprise COBOL.

The installed base is measured in hundreds of billions of lines.

The survey estimate ranges from 775 to 850 billion lines in daily use. It is an estimate from respondents, not a census, and we show the full range rather than a single figure.

Parse time for your estate

PYD ENTERPRISES model figure

~2 h

2M LOC at about 1 million LOC per hour on one 32-vCPU node (PYD ENTERPRISES measured throughput). Rule extraction and synthesis add a few hours.

PYD ENTERPRISES model figures

Our own planning numbers, kept apart from the research.

These come from PYD ENTERPRISES' engagements and benchmarks. Use them to scope a discovery phase; do not cite them as industry statistics.

Run the ROI calculator
Manual discovery cost
$0.40 to $0.75 per LOC
PYD ENTERPRISES engagement benchmarks
Parse throughput
~1M LOC per hour
One 32-vCPU node, PYD ENTERPRISES measured
Discovery timeline
~9 months to ~3 weeks
PYD ENTERPRISES engagements

Methodology

How the index is built.

Five rules, applied to every figure. If a number does not meet them, it is not here.

License: CC BY 4.0

The index text, charts and compilation are published under the Creative Commons Attribution 4.0 International license. Reuse them with attribution to PYD ENTERPRISES and a link to this page. Third-party figures remain the work of their publishers.

  1. 01Only sources we can linkEvery external figure on this page comes from a published report or regulatory notice with a public URL. We cite the publisher, the date and the scope of each figure exactly as published.
  2. 02Ranges stay rangesWhere a source publishes an estimate range, such as 775 to 850 billion lines of COBOL, we show the range and the point estimate together, so readers can see the uncertainty.
  3. 03Different measures are not combinedCISQ's annual cost of poor software quality and its accumulated technical debt figure measure different things. We never add, scale or extrapolate figures across sources.
  4. 04PYD ENTERPRISES figures are labelledThe discovery cost per line, the parse throughput and the timeline compression come from PYD ENTERPRISES' own engagements and benchmarks. They are tagged as PYD ENTERPRISES model figures wherever they appear.
  5. 05What we left outModernization failure percentages circulate widely in industry decks. We could not trace them to a methodology we can cite, so the index does not include them.

Sources

SourcePublishedFigures used
Vanson Bourne for Micro Focus, COBOL usage surveyFebruary 2022800B+ lines in daily use (range 775 to 850B); 43% on IBM z/OS
CISQ, The Cost of Poor Software Quality in the US: A 2022 Report2022$2.41T cost of poor software quality; $1.52T accumulated technical debt
US GAO, GAO-16-468: Federal Agencies Need to Address Aging Legacy SystemsMay 2016~75% of FY2015 federal IT budget on operations and maintenance
UK FCA and PRA final notices on TSB Bank plc20 December 2022£48.65M combined fine over the 2018 migration

Last reviewed 2 November 2026. No figures changed in this review.

FAQ

Using the index.

Can I cite the Legacy Modernization Index?

Yes. The index is published under the Creative Commons Attribution 4.0 International license (CC BY 4.0). Cite it as PYD ENTERPRISES Legacy Modernization Index (2026) with a link to this page, and cite the original publisher for any external figure you reuse.

Why is there no modernization failure rate?

Because we could not find one with a methodology we are comfortable citing. Several percentages circulate in vendor material without a traceable survey design, sample or definition of failure. We would rather publish fewer numbers than repeat ones we cannot source.

Where do the PYD ENTERPRISES model figures come from?

From PYD ENTERPRISES' own engagements: the cost of manual discovery per line of code observed on programs we have benchmarked against, our measured parser throughput on a 32-vCPU node, and the elapsed time of discovery phases with and without the platform. They are planning figures for scoping, not industry statistics.

How often is the index updated?

We review sources when a new edition of a cited report is published and at least once a year. Changes are listed with the date at the bottom of the methodology section.

Replace the estimate with your own inventory.

Run PYD ENTERPRISES on up to 100,000 lines in your private VPC and see your actual rule count, lineage and interfaces.